23 Aug August 23, 2014

Twill Table Runner Project Step Two

suzanne 2 Uncategorized

Twill Project 4 | Designs by SuzieI now have the 3 warp sections of this project done and ready for the loom. Each little
group in the warp chains are of 12 threads each and then on each end are 4 threads
which will be the selvage edges of the table runner. The reason each seection is in a
chain is so that the warp will not get tangled up and threads twisted before it is put on
the loom. The total length of each warp is 90 inches long and that allows for tie up and
the fringe that will be on each end. Now it is time for the Warps to be put on the Loom.

Will have pictures of it going on the loom this week and another post so pls check back.

Twill Project 5 | Designs by SuzieTwill Projec 6t | Designs by SuzieTwill Project 7| Designs by SuzieTwill Project 8| Designs by Suzie

2 thoughts on “Twill Table Runner Project Step Two

  1. Crystal says:

    You are Really getting it done Woman…… So impressed with your organization of your Projects, and your Creativity! Your Honey is Smiling down in Awe of how far you’ve come! God Bless You!!!

  2. Kenn says:

    The colors remind me of shiny ribbon hard candy.
    Looks great.

Leave a Reply

Your email address will not be published. Required fields are marked *